Home [23030]

-
Another leg of the cable system ends near the Bell building. -
Hugh from Blair Electronics assessing the signal quality on his cable modem. -
Yvan from Blair Electronics taking a break and happy to see things working. -
Testing the Polycom SP video conferencing unit at the Nursing Station. -
Testing the Polycom SP video conferencing unit via a cable modem. -
Hugh, Ted (Northern Stores Manager) and Angus at the Northern Stores residence where the video conferencing test via cable modem -
Dan Pellerin via video conferencing. -
The Cisco 2924 switch labelled to identify ports. -
The uBR7223 is now the routing all traffic. The satellite modems are connected via serial cables to the uBR7223. -
A closeup of the uBR7223 connections. The console and aux ports are connected to the RSM-3 for remote access. -
A view of the entire rack. -
Closeup of the RF equipment. From top to bottom:
[list]
[*]RSM-3 for remote access
[*]Patch panel for RF signals
[*]Control -
Final testing and adjustments. -
The call quality using an ip phone is excellent. The latency of the satellite hop causes some delay. -
About 10:30AM a gravel truck tore through the hydro line serving the Fort Severn Airport. This mishap caused a power outage for