The installation of additional equipment. UPS and power distribution updated. Fiber between MeetMe and library roof lit with a new switch at library roof.

-
The entire rack at the library roof -
IM000422 -
The K-Net switch installed at the library roof. The radio equipment is for the future 100Mb microwave (AFAIK) and at the bottom -
The fiber patch panel is located at the library roof and connects back to the MeetMe room -
Another view of the fiber patch panels at the MeetMee room -
The top most fiber patch panel connects the MeetMe room to the library roof -
MeetMe cabinet UPS -
MeetMe cabinet Bell 100Mb fiber demarcation -
MeetMe cabinet Bell 100Mb fiber demarcation -
MeetMe cabinet UPS -
MeetMe cabinet power distribution.