
-
Cable Run in Reception area
-
Cable run to library
-
Reception Area Xplornet Modem
-
Vent behind six MACs
-
New Cable Runs
-
reception area cable run
-
Power Distribution in Server rack
-
Crawlspace 1
-
Crawlspace 2
-
Reception area switch
-
Xplornet modem and DLink router
-
four PCs on back wall of library.
-
proposed route for cable runs from crawlspace to main floor
-
inside the server cage
-
the library switch