November 7, 2001 Some photos taken during the upgrade of the Deer Lake cable system. Work is still ongoing and more pictures will be added.....

-
The finished product.
-
The technology behind the Deer Lake community channel.
-
The equipment providing cable television.
-
The power supply and main amplifier.
-
Behind the cable equipment racks.
-
The cable headend and radio station.
-
Deer Lake.
-
Blair Electronics equipment loaded into a Wasaya charter.
-
Troubleshooting a cable router problem in Sioux Lookout.
-
abu
-
abv
-
abw
-
abx
-
Roy attaching the wire to the pole.
-
The finished job.