Home / Satellite Earth Station Construction and Installation - 2004-06-21 / Day 11 - June 13, 2004 [11]
The wind picked up again postponing the installation of the dish onto the base. Other tasks are being undertaken by Paul, Pat and Larry.
- aal
- aak
- aaj
- aai
- aah
- aag
- The grounding system requires a 2.5 foot trench all around the base with the 8 foot grounding rods driven down around the founda
- Pat digs out the corners of the base to lay down the grounding cable and rods to deal with potential lightening strikes
- Temporary electrial panel installed for construction site
- Dish is ready and tied down as the wind blows too strong for the lift to happen today
- Site and equipment is all ready for the lift onto the base that is scheduled for early tomorrow morning