Home / Satellite Earth Station Construction and Installation - 2004-06-21 / Day 3 - June 04, 2004 [15]
No description
- Electrical Panel - Outside Control Room
- Individual Panels in Crates get assembled to create the 7.3M antenna
- Elevation Adjustment Handcrank
- Reflector Barrel
- Control Room Elec. Panel
- Control Room Elec. Panel
- HPIM0255
- Mast Assembly with Worm Gear
- HPIM0253
- Pivot Arm Just Installed
- Pivot Arm just installed
- Backup Power Generator
- Loader to Lift Pivot Arm into Place
- HPIM0248
- HPIM0247