Home / Deer Lake Cable Upgrade [66]
- abu
- abv
- abw
- abx
- Roy attaching the wire to the pole.
- Raising of the pole.
- abt
- abq
- Attaching the pole to the boom.
- The reception area at the day care center.
- Installation of the cable drop at the day care center.
- A hole for a new pole is being drilled.
- abp
- The rack at the cable neadend. From top to bottom: upconverter, switch, registration server, cable router and UPS.
- Another view of the rack.