Home / Fort Severn Cable Upgrade [19]
Creation date / 2001 / August

-
A new hydro pole arrives at the scene.
-
aam
-
The culprit, a rock truck didn't lower its dump.
-
New DOCSIS compliant amplifiers.
-
The amplifier at the cable headend, opened up for alignments.
-
Testing the Polycom SP video conferencing unit at the Nursing Station.
-
Testing the Polycom SP video conferencing unit via a cable modem.
-
Hugh, Ted (Northern Stores Manager) and Angus at the Northern Stores residence where the video conferencing test via cable modem
-
Dan Pellerin via video conferencing.
-
The Cisco 2924 switch labelled to identify ports.
-
A closeup of the uBR7223 connections. The console and aux ports are connected to the RSM-3 for remote access.
-
Closeup of the RF equipment. From top to bottom: [list] [*]RSM-3 for remote access [*]Patch panel for RF signals [*]Control
-
Final testing and adjustments.
-
The cable headend equipment. The upconverter is in the left most rack at the very top. The other equipment are satellite receive
-
The ip phone in it's new home at the Northern Chiefs office in Fort Severn.