- K-Net equipment at Lakehead University Braun building.
- Equipment rack at the NOTC building. This is where Lakehead fiber and Bell fiber are to be fused.
- NOTC building electrical room.
- Fiber panels at NOTC. Bell fiber termination at the very bottom.
- Network wiring of the rack at NOTC.
- smallIMG_1706
- smallIMG_1707
- smallIMG_1708
- smallIMG_1709
- smallIMG_1710
- smallIMG_1711
- smallIMG_1712
- smallIMG_1713
- smallIMG_1714
- smallIMG_1715