- Darryl MacArthur of TBayTel. Crescive and Lakehead University wireless equipment in the background.
- The future location for the Aperto units and the 100Mb microwave link to Vickers Street on the Library roof. The TBayTel Vickers
- Aperto Wireless equipment indoors at the Lakehead University Library roof.
- Aperto Wireless equipment indoors at the Lakehead University Library roof.
- Terry Moreau and Frank Christen at the NOTC building.
- K-Net equipment at Lakehead University Braun building prior to connecting Crescive cross-connect.
- K-Net equipment at Lakehead University Braun building.
- K-Net equipment at Lakehead University Braun building.
- K-Net equipment at Lakehead University Braun building.
- Equipment rack at the NOTC building. This is where Lakehead fiber and Bell fiber are to be fused.
- NOTC building electrical room.
- Fiber panels at NOTC. Bell fiber termination at the very bottom.
- Network wiring of the rack at NOTC.
- smallIMG_1706
- smallIMG_1707