Home [99]
Creation date / 2004 / Week 24
- Temporary electrial panel installed for construction site
- Pat digs out the corners of the base to lay down the grounding cable and rods to deal with potential lightening strikes
- The grounding system requires a 2.5 foot trench all around the base with the 8 foot grounding rods driven down around the founda
- aag
- aah
- aai
- aaj
- aak
- aal