Home / Deer Lake Cable Upgrade - 2001-11-07 [66]
Post date / 2010 / April
- The first video conference from the Bandoffice. This is still going over the 384kbps SDSL line because the cable system is not o
- Corey Meekis examining the action.
- A closeup of the video conferencing equipment. Dan Pellerin in Sioux Lookout and the picture-in-picture showing local participan
- A Blair Electronics worker installing a cable amplifer on a pole near the Deer Lake school.
- aae
- aaf
- The Deer Lake cable headend. This building is also the local TV and radios station.
- Hugh waiting to report signal levels to the crew adjusting levels on line amplifiers.
- The interior of the radio station.
- Lars in the doorway to the Wahsa classroom. The network wiring going through this room has been cleanup.
- The public access computers all displaying http://www.knet.ca
- Lars doing surgery on Archie Meekis' computer at the band office.
- The video conferencing unit running at 512kpbs over the cable system is attracting a crowd at the band office.
- The second video session from the Deer Lake band office. This time via the cable system.
- John Moreau...