August 26, 2001 Pictures documenting the upgrade of the Fort Severn cable system to DCOSIS standard between Monday, August 20, 2001 and Saturday, August 25, 2001.
- Another leg of the cable system ends near the Bell building.
- A loose test cable caused an increase in the bit error (
- A downstream S/N ratio of 38.5dB and a bit error
- The main amplifier tuned and closed up.
- The ip phone in it's new home at the Northern Chiefs office in Fort Severn.
- The cable headend equipment. The upconverter is in the left most rack at the very top. The other equipment are satellite receive
- Final testing and adjustments.
- Closeup of the RF equipment. From top to bottom: [list] [*]RSM-3 for remote access [*]Patch panel for RF signals [*]Control
- A closeup of the uBR7223 connections. The console and aux ports are connected to the RSM-3 for remote access.
- The Cisco 2924 switch labelled to identify ports.
- Dan Pellerin via video conferencing.
- Hugh, Ted (Northern Stores Manager) and Angus at the Northern Stores residence where the video conferencing test via cable modem
- Testing the Polycom SP video conferencing unit via a cable modem.
- Testing the Polycom SP video conferencing unit at the Nursing Station.
- The amplifier at the cable headend, opened up for alignments.