Home / Fort Severn Cable Upgrade - 2001-08-26 [32]
Post date / 2010 / April
- Yvan from Blair Electronics taking a break and happy to see things working.
- The uBR7223 is now the routing all traffic. The satellite modems are connected via serial cables to the uBR7223.
- The uBR7223 is now feeding a signal into the cable system. Internet connectivity is still provided through the Cisco 2621 in the
- The satellite rack, uBR7223, cable registration server and DirecPC box (K-Net Router).
- The main amplifier tuned and closed up.
- The ip phone in it's new home at the Northern Chiefs office in Fort Severn.
- The culprit, a rock truck didn't lower its dump.
- The Cisco uBR7223 placed on the satellite equipment rack.
- The Cisco 2924 switch labelled to identify ports.
- The call quality using an ip phone is excellent. The latency of the satellite hop causes some delay.
- The cable headend equipment. The upconverter is in the left most rack at the very top. The other equipment are satellite receive
- The Bell Telephone cable torn apart.
- The Band Office, Nursing Station, KIHS classroom and school are fed via ethernet.
- The amplifier at the cable headend, opened up for alignments.
- Testing the Polycom SP video conferencing unit via a cable modem.