
-
Testing the network connection at the Community Hall. -
The location of the network connection in the community hall. -
The KiHS and eCenter with the cable system cables leaving the building. -
The equipment rack all neat and tidy. -
The room with the headend equipment upon my arrival on Nov 27, 2001. -
The furnace room before moving equipment to the cable headend room. -
The network equipment rack assembled. -
The furnace room after the router had been moved into the rack. -
The North Spirit Lake e-Center. -
The installation of the cable modem at the Elementary School.