- The entire rack at the library roof
- IM000422
- The K-Net switch installed at the library roof. The radio equipment is for the future 100Mb microwave (AFAIK) and at the bottom
- The fiber patch panel is located at the library roof and connects back to the MeetMe room
- Another view of the fiber patch panels at the MeetMee room
- The top most fiber patch panel connects the MeetMe room to the library roof
- MeetMe cabinet UPS
- MeetMe cabinet Bell 100Mb fiber demarcation
- MeetMe cabinet Bell 100Mb fiber demarcation
- MeetMe cabinet UPS
- MeetMe cabinet power distribution.
- The final exercise for the local health team involved having workshop participants priorize the expectations and needs providing
- Everyone was asked to share their experiences with these new communication tools over the past year
- The rich pictures and expectations from last year's workshops were reviewed in detail
- Presentations were made about the Smart Communities project and a broad overview of some of achievements