- The grounding system requires a 2.5 foot trench all around the base with the 8 foot grounding rods driven down around the founda
- Pat digs out the corners of the base to lay down the grounding cable and rods to deal with potential lightening strikes
- Temporary electrial panel installed for construction site
- Dish is ready and tied down as the wind blows too strong for the lift to happen today
- Site and equipment is all ready for the lift onto the base that is scheduled for early tomorrow morning
- Five NOMS visitors to KO's Balmertown office with Geordi Kakepetum, KO Executive Director
- Meeting at the Sioux Lookout First Nations Health Authority meeting room
- Meeting in Balmertown board room
- aad
- aae
- Dr. David Boyle at Red Lake airport