- Cable headend and antenna farm.
- Network equipment rack installed by Blair Electronics.
- Linkway with frame-relay card installed.
- Wawatay-article1-Apr3-03: KiHS in action
- Wawatay-article2-Apr3-03: Year 2 Virtual Conference
- The Cisco ubr7223 router.
- The PA-4T+ port adapter card.
- The port adapter slot is in the second row from the top and on the right hand side of the router. The locking latch needs to be
- The panel is replaced with the port adapter card. The card is inserted with the circuitboard facing down.
- Once the port adapter card has been inserted all the way, the latch needs to be moved to the lock position.
- The back of the linkway terminal. The panel to be removed is at the bottom left of the Linkway. It is held in place with 4 small
- Screws and panel removed.
- The Linkway frame-relay card.
- The frame-relay card slides in plastic rails inside the slot. Once inserted the card is secured with the 4 screws that held the
- The cables.