Home [23030]

-
Ruth Baxter, Executive Director at Oshki-Pimache-O-Win thanks all in attendance. Also a special recognition for the support from -
ACSW Program celebration photo -
Students and friends in line for lunch -
20003 Graduates of the ACSW Program Back left:Dorothy Meekis-Deer Lake First Nation,Sara Jane Cromarty-Wunnumin Lake First Natio -
The router and Linkway terminal connected by frame-relay. -
The other end of the cabe connected to port 0 of the port adapter card. The 2 screws on the cable should be tightened hand tight -
One end of the cable attached to the frame-relay card. The shape of the connector allows the cable to be connected in one partic -
The cables. -
The frame-relay card slides in plastic rails inside the slot. Once inserted the card is secured with the 4 screws that held the -
The Linkway frame-relay card. -
Screws and panel removed. -
The back of the linkway terminal. The panel to be removed is at the bottom left of the Linkway. It is held in place with 4 small -
Once the port adapter card has been inserted all the way, the latch needs to be moved to the lock position. -
The panel is replaced with the port adapter card. The card is inserted with the circuitboard facing down. -
The port adapter slot is in the second row from the top and on the right hand side of the router. The locking latch needs to be