|
|
Album: Koocheching Solar
Date: 03/28/08
Size: 18 items
Views: 737
|
|
Album: Construction of new Cell tower and Telco Shack in North Caribou
Construction of new Cell tower and Telco Shack in North Caribou Lake First Nation
Date: 06/10/08
Size: 9 items
Views: 786
|
|
|
Album: Construction of the Koocheching Tower and Telecom Building
Construction of the Koocheching First Nation Tower and Telecom Building by Blair Electronics
Date: 06/10/08
Size: 11 items
Views: 846
|
|
Album: The new Telecom Building and Tower in Keewaywin First Nation
Pictures of the DC power backup unit that arrived along with pictures of the cabling and tower at the telecom building in Keewaywin
Date: 07/10/08
Size: 44 items
Views: 885
|
|
|
Album: The 3.8m VSAT Dish in Sioux Lookout - 2000-10-22
Fri September 22, 2000 The installation of the 3.8m dish at the watertower for the Fort Severn connection.
Date: 03/21/02
Size: 8 items
Views: 1338
|
|
Album: Fort Severn cell equipment installation
Just after BTS/cell equipment install
Date: 12/07/09
Size: 25 items
Views: 573
|
|
|
Album: Deer Lake cell equipment installation.
Just after the initial BTS/equipment installation
Date: 12/07/09
Size: 23 items
Views: 540
|
|
Album: Poplar Hill Cellular bldg construction
Date: 09/22/09
Size: 56 items
Views: 630
|
|
|
Album: North Spirit Lake Cellular bldg construction
Date: 09/22/09
Size: 35 items
Views: 525
|
|
Album: Fort Severn Cellular bldg construction
Date: 09/22/09
Size: 104 items
Views: 625
|
|
|
Album: Peawanuck Cable Head End
Date: 09/14/09
Size: 4 items
Views: 336
|
|
Album: Attawapiskat Cable Head End
Date: 09/14/09
Size: 5 items
Views: 333
|
|
|
Album: Attawapiskat SCPC Upgrade
Date: 09/14/09
Size: 9 items
Views: 374
|
|
Album: Peawanuck SCPC Upgrade
Date: 09/14/09
Size: 15 items
Views: 477
|
|
|
Album: Satellite Hub
Date: 09/03/09
Size: 11 items
Views: 398
|
|
Album: Wawakapewin SCPC upgrade
Date: 08/28/09
Size: 21 items
Views: 436
|
|
|
Album: Cat Lake SCPC upgrade
Date: 08/20/09
Size: 6 items
Views: 338
|
|
Album: Slate Falls SCPC upgrade
Date: 08/20/09
Size: 5 items
Views: 306
|
|
|
Album: Fort Severn SCPC upgrade
Date: 08/14/09
Size: 27 items
Views: 474
|
|
Album: Switches in Toronto
Replaced switches in the co-location rack at Peer1 in Toronto.
Date: 08/06/09
Size: 7 items
Views: 354
|