|
|
Modems for Nursing station
These modems were redundant after the Fibre was terminated.
Date: 2/22/2013
Views: 69
|
|
Album: Hudson and Frenchman's head tower work
Jesse Terry and Gord Closen working on the radio link between Hudson and Frenchman's Head
Date: 6/14/2012
Size: 15 items
Views: 166
|
|
|
Album: Koocheching Canopy rebuild
Date: 7/6/2012
Size: 17 items
Views: 214
|
|
Bandwidth manangment Cisco 1811 router at Nursing station
Bandwith Management in Wapekeka
Date: 3/20/2012
Views: 149
|
|
|
June15 228
Date: 7/23/2009
Views: 545
|
|
June15 234
Date: 7/23/2009
Views: 537
|
|
|
Album: Airport Fibre Break
No description
Date: 4/25/2006
Size: 11 items
Views: 552
|
|
Album: Free standing tower for wireless radios in Frenchman's Head - Aug 21, 2004
No description
Date: 8/22/2004
Size: 3 items
Views: 925
|
|
|
Album: Construction of the K-Net Network and Equipment Maintenance Centre
No description
Date: 11/3/2003
Size: 10 items
Views: 1059
|
|
Album: Sioux Lookout Local Fibre Optic loop development
Expertech has been contracted by Keewaytinook Okimakanak to run a local fibre optic loop connecting Sioux Lookout agencies to K-Net.
Date: 10/2/2002
Size: 3 items
Views: 444
|
|
|
Album: pictures for dan
of the white and grey cables under the gymnasium crawl space
Date: 4/11/2002
Size: 25 items
Views: 1626
|
|
Album: Pays Plat Connections
Date: 6/28/2007
Size: 32 items
Views: 688
|
|
|
Album: Aroland Suscriber Unit Installs
Date: 11/2/2007
Size: 14 items
Views: 519
|
|
Album: Koocheching Solar
Date: 3/28/2008
Size: 18 items
Views: 737
|
|
|
Album: Construction of the Koocheching Tower and Telecom Building
Construction of the Koocheching First Nation Tower and Telecom Building by Blair Electronics
Date: 6/10/2008
Size: 11 items
Views: 843
|
|
Album: Satellite Hub
Date: 9/3/2009
Size: 11 items
Views: 397
|
|
|
Album: Switches in Toronto
Replaced switches in the co-location rack at Peer1 in Toronto.
Date: 8/6/2009
Size: 7 items
Views: 353
|
|
Album: Sioux Lookout Library
The fiber entrance at the Sioux Lookout library. This is where the fiber crosses the concrete hydro conduit. The K-Net fiber is enclosed in a 1" PVC conduit and lays directly on the hydro concrete. All of this is 6" to 8" below grade.
Date: 8/6/2009
Size: 7 items
Views: 317
|
|
|
Album: Koocheching Broadband Project
Date: 4/6/2009
Size: 29 items
Views: 398
|
|
Album: Wabun Network Equipment
Date: 4/2/2008
Size: 4 items
Views: 806
|